Qualified Persons Portal

Form E

Application for Connection of Temporary Toilet Facilities to Sewerage System*

For Re-Submission, please enter previous Submission No. (otherwise, keep this field blank).

To :
Director
Water Reclamation
(Network) Department
Public Utilities Board
#14-00 Environment Building
40 Scotts Road
Singapore 228231

DEVELOPMENT PROJECT PARTICULARS

Please be reminded that starting from 1 April 2018, only Licensed Plumber (LP) is allowed to submit the application to PUB and carry out the sanitary works.

This e-service facilitates the QP/ Contractor/ Plumber on the application to PUB for the connection of temporary toilet/ sanitary facilities at construction sites to public sewers or approved sewerage systems, after the QP has registered the detailed plan for provision of temporary toilets with the CBPD (NEA).

Form B (Application to work in Public Sewer) is to be submitted if it involves a new connection to the existing sewer. Form B can be submitted through email at PUB_FORM_B@pub.gov.sg by contractor / plumber or through Corenet-e-submission system by QP.

Upon completion of the works, the applicant shall notify PUB, Water Reclamation (Network) Department (WRN) via online Form H (Notification for Completion of Minor Sewerage Works) and submit Form G (Application for Adjusting Sanitary Appliances Fees) to declare the quantity of sanitary fittings installed. The Department may carry out audit inspection to the completed works.

You will be prompted by a system message if your application has been successfully received. Please take note of the Submission No. generated by the system and quote this number for all future correspondences related to this application.

A response/approval will be sent to the applicant’s email or fax number as provided by the applicant in the form within 7 working days.

Requirements

All relevant information shall be submitted with the application including the following:

  • 1. Detailed plans showing the following:
    • a. Project site location
    • b. Temporary sanitary/ layout of toilet(s)
    • c. Proposed point of connection to inspection chamber, public sewer or proposed holding tank (SIP is required when connection is made to public sewer or holding tank)
    • d. Other relevant details
  • 2. Calculation of holding tank capacity, sectional plan and letter of award for licensed waste collector (if proposed)
  • 3. NEA's Clearance Certificate for the detailed plans on Environmental Health.

Estimation of Time Required

This form may take you about 15 minutes to fill in.

Required Attachment

  • 1. Certificate of Registration of a Factory for the above project (where applicable).
  • 2. Sewerage Information Plan (SIP) showing the highlighted proposed point ofsewer connection and approved plan, and/or sections of sewers to be inspected.
  • 3. Activity – Based Risk Assessment Form.
  • 4. Certificate of Confined Space Safety Assessors Course / Manhole Safety Assessor Course of the competent person deployed at work site.
  • 5. Method statement of the works.

Contact

For enquiries pertaining to your Form E submission, please contact our officers at 67313254 or 67313306.

For other enquiries, please contact PUB Building Plan Unit at 67313512 or email at PUB_BPU@pub.gov.sg.


I hereby apply for the approval for construction of the temporary sanitary / toilet facilities at the below-mentioned construction site and its connection to:

*

Note1 : No person shall enter the public sewerage system to carry out any works without the prior approval of the Director, Water Reclamation (Network) Department. The contractor shall submit the Form B/QP - "Application To Work In Public System" and obtain the prior approval from Water Reclamation (Network) Department before allowing his workmen to enter the sewer/manhole to carry out any works including inspection works in the sewer/manhole and other confine spaces.

QP PARTICULARS

The QP who is responsible to obtain the clearance certificate from CBPU (NEA) for the provision of the temporary sanitary/toilet facilities at the above construction site is as follow: (Note - NEA’s Clearance Certificate for Detailed Plan on Environmental Health shall be submitted)

DECLARATION BY THE CONTRACTOR WHO OWNS AND MAINTAINS THE TEMPORARY TOILET FACILITIES

I/We shall be responsible for the following:

Proper maintenance of the sanitary drainage system/ temporary holding tank and engage a Licensed Waste Contractor to dispose of used water from the holding tank to the designated Water Reclamation Plant (PUB)

Sealing off the temporary sewer connection to sewerage system upon completion of the project and to notify Water Reclamation (Network) Department, PUB of the works

Emolishing the temporary holding tank upon completion of the project and to notify Water Reclamation (Network) Department, PUB of the works


Note2 When the contractor vacates the construction site, he shall notify PUB, Water Reclamation (Network) Department (WRN) via online Form H (Notification for Completion of Minor Sewerage Works) to confirm the sealing off temporary sewer connection to sewerage system or demolition of temporary holding tank.

DECLARATION BY THE APPLICANT WHO CONSTRUCTS THE TEMPORARY TOILET FACILITIES

I confirm that all the particulars given in this form are correct .

I also confirm that the following plans and documents are uploaded at Section V:

Site, location and sanitary/toilet layout plans;

NEA’s Clearance certificate for Environmental Health;

Proposed point of connection to inspection chamber, public sewer or proposed holding tank (SIP is required when connection is made to public sewer or holding tank);

Calculation of holding tank capacity, sectional plan of holding tank (High level alarm sensor and beacon to be indicated);

Contract agreement with NEA’s Licensed Waste Contractor for maintenance of the holding tank.

I hereby undertake to carry out the proposed temporary sanitary/toilet facilities, sanitary drainlines and its connection to sewerage system and complete the temporary toilet works by *

in accordance with the proposed plans submitted by me, the requirements of the Code of Practice on Sewerage and Sanitary Works and any conditions and requirements imposed by PUB.

Upon completion of the works, I shall submit an online Form H (Notification for Completion of Minor Sewerage Works) to notify PUB, Water Reclamation (Network) Department for inspection/water testing of the sanitary drainlines/sewers, etc.


SUPPORTING DOCUMENTS

Add file
All enquiries on submission may be made through email at (pub_bpu@pub.gov.sg).